LED Sky Installation
800 Panel LED Mapping
The digital LED installation "Connected", which was already inaugurated at the end of 2021 in the foyer, opposite the 325m² "Mega Wall", was conceptualized, produced and finally installed together with the full-service agency Mehnert Corporate Design and the creative LED specialist tennagels Medientechnik. The almost 60 m² sail consists of 401 double, interlinked LED elements, which were developed especially for the project. The elements condense, similar to a mosaic in the middle and drift a little further apart at the edges. In this way, both the dynamics of the company and the harmony in the overall image are to be emphasized and maintained. The sandwich-like arrangement allows two different images to be created across the elements - one radiating upwards, the other downwards.